Welcome To our shop !

PROP SHAFT PRP-PO-09-023

$146.00 $832.99

Dynamically balanced to reduce noise and vibration, lengthening its life and the time between re-servicing. All Balls Stealth Drive Prop Shafts include a carrier bearing to reduce cost, ease assembly and provide a complete ready-to-install driveline, out o

Qty:

Payment:

Payment Option Image

Dynamically balanced to reduce noise and vibration, lengthening its life and the time between re-servicing. All Balls Stealth Drive Prop Shafts include a carrier bearing to reduce cost, ease assembly and provide a complete ready-to-install driveline, out of the box.

Features:

  • Phased pairs are balanced and phased as complete, two-piece assemblies.
  • Designed with the same dimensions as O.E.M. drive shafts for guaranteed fitment.
  • Greaseable U-joints allow maintenance of the drive shaft.

Reviews

There are no reviews yet.

Be the first to review “PROP SHAFT PRP-PO-09-023”

Your email address will not be published. Required fields are marked *